Director of Project Controls
Can cost and schedule be read together, without a spreadsheet in between?
For Directors of Project ControlsDesign automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessData platforms, analytics, governance and AI that the business can trust, from first pipeline to production AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationAutomation and project data, from AEC production specialists since 2003.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessEnterprise data platforms, analytics, governance and AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationCost and schedule integration in construction links schedule activities to the cost codes they drive.
Progress and spend can then be read side by side, so a project that is spending ahead of its progress shows up while there is time to respond.
The schedule and the cost report are usually owned by different people in different systems.
Each is accurate on its own, but nobody sees whether the money spent matches the work done until month-end.
By then a job spending ahead of its progress has had weeks to drift, and the two reports are reviewed in separate meetings.
One job, two reports
How progress and spend are reviewed today
| Schedule | Owned by the scheduler, in P6 or Project |
|---|---|
| Cost report | Owned by finance, in the ERP |
| Comparison | At month-end, if at all |
Schedule activities matched to cost codes, so progress and spend are read together.
| Step | What happens |
|---|---|
| Link | Schedule activities mapped to the cost codes they drive, agreed with project controls |
| Load | Schedule progress and job cost loaded into the same model |
| Compare | Progress and spend shown side by side, activity by activity |
| Flag | Activities where spend runs ahead of progress are highlighted |
Progress and spend, side by side
The roles who need to see whether the money spent matches the work done.
Can cost and schedule be read together, without a spreadsheet in between?
For Directors of Project ControlsWhich jobs are spending ahead of their progress, and since when?
Which activities drive which costs, agreed once and kept current?
The link between activities and cost codes is agreed first, then built on reconciled data.
How schedule activities map to cost codes is agreed with project controls.
Schedule progress and job cost are loaded into the same model.
Progress and spend are compared activity by activity, and any gap is flagged.
The comparison is refreshed on a schedule matching how often schedules are updated.
Where progress and spend are seen
Separate meetings: In two reports, by two teams
One view: Side by side, on one screen
When a gap shows
Separate meetings: At month-end
One view: As soon as it opens
How activities relate to cost
Separate meetings: Assumed
One view: Mapped and agreed
What the review discusses
Separate meetings: Whose figures are right
One view: What to do about the gap
Reporting is only as good as the data underneath it. A report built on unreconciled data fails the first time a number does not tie to the ledger, and trust is hard to win back. So reporting is built after the data is in order: source systems connected through construction ERP data integration, and modelled in the construction data warehouse. Where that groundwork does not yet exist, it comes first.
Reporting comes last
The order every report is built in
| Source systems | Connected and checked first |
|---|---|
| Data model | Defined once, reconciled to source |
| Reporting | Built on top, tied to the ledger |
Drawing and model production are delivered through bluentcad.com, not through this service.
Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.
SOC 2 Type I and Type II attestations held. Security & SOC 2.
Primavera P6 and Microsoft Project. Naming a product describes the work; it is not a partnership claim.
No. The link between activities and cost codes is agreed with project controls as part of the work.
On a schedule agreed with the firm, usually matching how often schedules are updated.
That is common. The mapping is agreed with project controls, so each cost code is counted once.
With a Project Data Walkthrough, at no charge, centred on cost and schedule integration: one page naming the specific problems found, and one named next step.