Procore Data Integration
Procore project, cost and log data read into the model, with every load checked against Procore itself.
Naming a product describes the work; it is not a partnership claim.
- Budgets and commitments
- Change orders
- Daily logs
Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessData platforms, analytics, governance and AI that the business can trust, from first pipeline to production AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationAutomation and project data, from AEC production specialists since 2003.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessEnterprise data platforms, analytics, governance and AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationConstruction ERP data integration reads project, cost and commitment data from the systems a construction business already runs, and loads it into one model.
Every load is checked against its source, so the data underneath reporting can be trusted.
Construction systems were built to run a job, not to share data.
Accounting holds cost by cost code, project tools hold commitments, change orders and logs, and schedules hold time.
Each system uses its own project numbering. Connecting them is less about moving data than about meaning: which job, which cost code, which version of a commitment.
One job, three identities
How each system knows the same project
| Accounting | By cost code |
|---|---|
| Project tool | By commitment and change order |
| Schedule | By activity |
Accounting, project management and scheduling systems connected and read on a schedule.
| Source type | What is read |
|---|---|
| Accounting and ERP Sage 300 CRE, Viewpoint Vista, CMiC | Job cost, commitments, billing and vendors |
| Project management Procore, Autodesk Construction Cloud | Budgets, change orders, logs and documents |
| Scheduling Primavera P6, Microsoft Project | Activities, dates and progress |
| Spreadsheets The firm’s own trackers | Data that exists nowhere else, brought under control |
How every load is checked
Smaller source system integration pieces, each with its own page, inputs and outputs.
Procore project, cost and log data read into the model, with every load checked against Procore itself.
Naming a product describes the work; it is not a partnership claim.
Job cost and commitment data extracted from construction accounting systems, reconciled to their own control totals.
Existing integrations that have stopped agreeing, diagnosed and fixed, so the figures match their source again.
The roles who rely on source data arriving complete and correct.
Does job cost in the reports match the accounting system exactly?
For CFOs & Finance LeadersWho has access to which system, and what does each connection read?
For CIOs & IT DirectorsCan commitments and change orders be read without exporting them by hand?
For Directors of Project ControlsOne source system at a time, with the checks agreed before the first load.
A ninety-minute conversation at no charge, naming the source system to connect first and the outputs it should produce.
Read access is agreed with the firm’s IT team. Nothing is ever written back to a source system.
The connection is built and every load is compared with the source on row counts, control totals and key figures.
The connection runs on an agreed schedule, and any change in the source is caught by the checks before a report.
How data moves
Exports and spreadsheets: Exported by hand each month
Connected and checked: Read on a schedule
When a number is wrong
Exports and spreadsheets: Found in the meeting
Connected and checked: Flagged at the load
Project numbering
Exports and spreadsheets: Different in each system
Connected and checked: Mapped once, then reused
When a source changes
Exports and spreadsheets: The report breaks quietly
Connected and checked: The checks catch it first
Every connection reads from the source system through access agreed with the firm’s IT team, and nothing is ever written back. Source systems stay exactly as they are, run by the firm and its vendors, while the model underneath reporting is kept current and checked.
Drawing and model production are delivered through bluentcad.com, not through this service.
Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.
SOC 2 Type I and Type II attestations held. Security & SOC 2.
Usually the one finance relies on most, often the accounting system. A Project Data Walkthrough identifies it.
Read access, agreed with the firm’s IT team. Nothing is written back to a source system.
The checks on every load show it immediately, so a change is caught before it reaches a report.
On a schedule agreed with the firm, set by how current each report needs to be.
Yes. Trackers that hold data found nowhere else are brought under the same checks as the other sources.
The rule for which version is used is agreed with the firm once, then applied on every load.
With a Project Data Walkthrough, at no charge, centred on source system integration: one page naming the specific problems found, and one named next step.
Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy