The requirement arrives with a deadline
The client wants drawings, models and documents in a set structure, named a set way, by handover. The project started months ago without that structure, so the files have to be reworked to fit.
Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessData platforms, analytics, governance and AI that the business can trust, from first pipeline to production AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationAutomation and project data, from AEC production specialists since 2003.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessEnterprise data platforms, analytics, governance and AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationWhen a client sends an information requirement, every project has to deliver files in one structure, named one way, by one date.
BluEnt helps information managers put that standard in place once, where files actually live, so it holds on every project that follows.
Three moments most information managers will recognise, and the reason they keep coming back.
The client wants drawings, models and documents in a set structure, named a set way, by handover. The project started months ago without that structure, so the files have to be reworked to fit.
Each team saves files its own way. Search returns several copies of the same plan, nobody is sure which one is current, and the wrong version can reach the client.
The firm pays for a document platform, but it was never configured. Every project is organised differently inside it, so the platform stores files without holding any standard.
The same work, with one standard behind it, applied where files are saved rather than remembered by each team.
Each project names and files work its own way
One naming and numbering convention on every project
Client requirements are met by renaming files at the end
The client’s structure is in place from the first day
The platform holds files, but enforces nothing
The platform applies the standard as files are saved
Handover is rebuilt under deadline
Handover information builds up as the project runs
Each service puts one part of the standard in place: the rules themselves, the platform that holds them, and the connections to everything else the firm already uses.
Naming, numbering and classification (OmniClass, MasterFormat), written for daily use, with a one-page field guide.
Standards & ClassificationA common data environment configured on the platform the firm already licenses, with live projects moved in.
CDE Structure & RolloutThe other drives and platforms in use, connected and kept to the same structure, without replacing them.
Information HubFour steps, from a no-charge conversation to a standard the firm runs itself.
One conversation and one page naming three problems.
The client’s requirement, matched to how the firm files work today.
Agreed, then set up on the platform with a template project.
Administrators trained, with a one-page field guide.
Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.
SOC 2 Type I and Type II attestations held. See Security & SOC 2.
No. Live projects move into the standard in stages, starting with the ones closest to a client deadline.
No. The standard is set up on the platform the firm already licenses, and connected to the drives and platforms still in use.
The standard is applied where files are saved, so following it becomes the easiest way to work. Each team also gets a one-page field guide.
Yes. The first piece of work is usually the requirement due next, and the same standard then carries to the projects that follow.
The firm. Its own administrators are trained at handover and keep the standard running.
Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy