CFO or VP Finance
Do the reports show exactly what the accounting system shows?
For CFOs & Finance LeadersDesign automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessData platforms, analytics, governance and AI that the business can trust, from first pipeline to production AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationAutomation and project data, from AEC production specialists since 2003.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessEnterprise data platforms, analytics, governance and AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationSage 300 CRE data extraction reads job cost, commitment, billing and vendor data out of the accounting system and loads it into a model where it can be reported with other data. The same approach covers Viewpoint Vista.
Naming a product describes the work; it is not a partnership claim.
Every extraction is checked against the accounting system’s own totals.
The accounting system holds the figures finance trusts, but they rarely leave it cleanly.
Job cost, commitments and billing reach reports through manual exports, re-keyed and reformatted each month.
Every export is a snapshot that starts ageing the moment it is taken. When a report disagrees with the accounting system, finance spends the meeting proving which copy is current instead of discussing the job.
One job, three copies
Where the same job cost figure ends up
| Accounting system | The figure finance trusts |
|---|---|
| Monthly export | A snapshot, already ageing |
| Report spreadsheet | Re-keyed and reformatted |
Accounting data extracted on a schedule, ready for reporting, from either system.
| Data | Covered in Sage 300 CRE and Viewpoint Vista |
|---|---|
| Job cost by cost code | Covered in both systems |
| Commitments and subcontracts | Covered in both systems |
| Billing and receivables | Covered in both systems |
| Vendors | Covered in both systems |
| Checked against | Each system’s own job cost reports |
How every extraction is checked
The roles who need accounting data in reports without a manual export.
Do the reports show exactly what the accounting system shows?
For CFOs & Finance LeadersCan month-end reporting start without exporting and re-keying job cost?
What access does the extraction need, and is anything written back?
For CIOs & IT DirectorsFrom the accounting system as it stands to extracts checked against its own totals.
The data to extract, and the reports finance already trusts, are agreed with finance.
The extraction and its control-total checks are built by BluEnt.
Extracts are reconciled against the accounting reports, with finance, until every job matches.
The extraction is set to run on a schedule agreed with the firm.
The work is handed over with a runbook for the firm’s team.
How accounting data leaves the system
Manual exports: Exported and re-keyed by hand
Checked extractions: Extracted on a schedule
How it is checked
Manual exports: Spot-checked, if at all
Checked extractions: Against the system’s own totals
When a total does not match
Manual exports: Found in the meeting
Checked extractions: Held before it is accepted
How finance works
Manual exports: Around the exports
Checked extractions: Exactly as before, in the accounting system
Finance trusts the accounting system’s reports. So each extraction is checked against them: job by job, the loaded totals must match before the data is accepted. Finance keeps working in the accounting system exactly as before.
One extraction, job by job
Each job’s loaded total, compared with the accounting report
| Totals match | Accepted into the model |
|---|---|
| Totals differ | Held, with the difference shown |
| Report used | The one finance already trusts |
Drawing and model production are delivered through bluentcad.com, not through this service.
Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.
SOC 2 Type I and Type II attestations held. Security & SOC 2.
That depends on the access available, which is confirmed with the firm’s IT team before any build begins.
Yes. The same extraction and control-total approach applies, through the access Viewpoint Vista provides.
No. Finance keeps working in the accounting system. The extraction reads from it and checks against its reports.
The job cost reports finance already relies on, agreed at the start, so the checks use figures finance recognises.
Years of history are loaded separately, through historical backload, so live extraction is not slowed down.
No. The extraction reads data only, and the accounting system stays exactly as it is.
With a Project Data Walkthrough, at no charge, centred on Sage 300 CRE and Viewpoint extraction: one page naming the specific problems found, and one named next step.
Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy