Design automation, construction data and AI-readiness, built by the people who produce the drawings your systems describe.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessData platforms, analytics, governance and AI that the business can trust, from first pipeline to production AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationAutomation and project data, from AEC production specialists since 2003.
“Modelling work repeats, and the hire can’t be made”
Design Technology & Automation“The numbers don’t tie across your systems”
Construction Data & Project Controls“Your AI initiative stalled on the data underneath”
Information Governance & AI-ReadinessEnterprise data platforms, analytics, governance and AI.
“Data is spread across systems nobody trusts”
Data Engineering & Modern Platforms“Reports take days and still disagree”
Analytics & BI“No one owns the data, or its quality”
Data Governance & AI-Readiness“AI pilots never reach production”
AI & GenAI IntegrationIFC and COBie export automation replaces project-by-project export setup with a governed configuration.
Exports are defined by discipline and project stage, mapped to the properties the client requires, and checked before they are issued.
On many projects, IFC and COBie exports are set up again by hand.
Each export needs the right categories, property sets and naming, then the result is checked against the client’s requirements one property at a time.
When the setup lives in one person’s settings, the next project starts from nothing, and errors surface only when the client rejects the data.
Export settings by discipline and stage, checked against the client’s information requirements.
| Area | What it covers |
|---|---|
| Export configurations | Saved setups by discipline and project stage |
| IFC mapping | Revit categories and parameters mapped to IFC classes and property sets |
| COBie mapping | Model parameters mapped to the COBie fields the client requires |
| Validation | Exports checked against the client’s information requirements before issue |
| Exception list | Missing or incorrect values listed for correction in the model |
| Guide | How to apply the setups on new projects, and how to change them |
From today’s export settings to a validated setup the firm’s team maintains.
The client’s information requirements and a sample of past exports are read with the firm’s BIM lead.
BluEnt drafts the mappings; the BIM lead approves them.
The export configurations and checks are built by BluEnt.
The setup is tested on a live model, and every exception is resolved with the project team.
The setup is handed over with the guide.
Each new project
Set up by hand: Starts from nothing
Set up once: Starts from saved configurations
Who can run an export
Set up by hand: One experienced person
Set up once: Anyone following the guide
When errors are found
Set up by hand: When the client rejects the data
Set up once: Before the export is issued
When requirements change
Set up by hand: Every setting is revisited
Set up once: The mapping is updated once
Every export is validated against the client’s requirements before it leaves the firm. Missing or incorrect values are listed in an exception list, so they are corrected in the model, where they belong, rather than patched in the export. The IFC version is the one the client’s requirements specify.
Drawing production is delivered through bluentcad.com, not through this service.
Offices in the US, Canada, the UK, the Netherlands and India. How delivery works.
SOC 2 Type I and Type II attestations held. Security & SOC 2.
The version the client’s requirements specify. The export configurations are set up to that version and tested before use.
Only if the model already holds the required parameters. Gaps are listed in the exception list, so the firm can decide where the data should be added.
No. This work sets up and checks exports. Formal information-management roles under ISO 19650 sit outside this work.
Yes. Configurations are saved by discipline and stage, and the guide explains how to apply and change them.
The mapping is updated once and re-tested, rather than every setting being revisited by hand.
With a Project Data Walkthrough, at no charge, centred on IFC and COBie export automation: one page naming the specific problems found, and one named next step.
Your information is used only to reply to this enquiry and is never shared outside BluEnt. Privacy policy